I took a break and skipped out on the 3rd quarter so I am primed and ready to commit to finishes for the final quarter of Leanne’s finish-a-long (FAL).
I am going to try and finish a whopping 8 (Update 2013OCT11) 13 projects. Most of them are quilt tops waiting to be quilted .
First, I have two Christmas present projects that are in the piecing phase. Both are lap quilts that I hope the recipients will enjoy. Can’t give too many details or pictures in case they see my post.


Next I have two quilt tops from the Quiltessential Co. 2012 block of the month program. I did the blocks in two colour ways: Blues and Opera. They both need to be sandwiched, quilted and bound so that they will be ready for the quilt show in early January.

Then I have Leftovers I (trim and bind) and Leftovers II (sandwich, quilt and bind).

My Kimono wall hanging is still waiting to be quilted. I think it was on my Quarter 2 list but never got any attention.

I still have the first quilt top that I ever made. It is waiting for the last piece of the border to be sewn on and then comes the fun part…FMQ.

(Update: 2013Oct11) And last but not least I have volunteered to free motion quilt 5 tops for the High River Quilt Project (read more about it here).

Boy this is a big list but I’ve got faith that I can make a significant dent in my pile of quilt tops waiting for some free motion loving.